We use cookies and other technologies on this website to enhance your user experience.
By clicking any link on this page you are giving your consent to our Privacy Policy and Cookies Policy.

Omega Linkr Captures d'écran

À propos de Omega Linkr

Contrôle Smartphone pour les véhicules et plus!

Linkr allows you to start, lock, unlock, activate trunk release, track, and more directly from your phone!

NOTE: An Omega Linkr system must be installed in your vehicle for this app to operate.

NOTE: Locations are sent by SMS message with a link to Google Maps.

Models:

LINKR-MOBILE-2G is an international (outside the USA) system that works on any GSM cellular network with a user supplied SIM card.

LINKR-M1 uses the Verizon network in the USA. Activations & subscriptions are available at www.OmegaLinkr.com.

Omega Linkr is a smartphone interface that gives you control of vehicle convenience & security features from virtually anywhere in the world! This app can directly control Omega's Excalibur line of remote start/security systems & Omegalink vehicle specific remote start kits. It can also be hardwired directly to the vehicle.

Omega Linkr allows you to safely and securely remote start, lock / unlock, or open your car's trunk from virtually anywhere in the world.

Receive alerts and notifications if your vehicle is violated when installed with any compatible remote start / security system.

Main Features:

- Multi-user support

- Multi-device support

- Easy swipe between devices

- 6 languages supported: English, Spanish, French, Malay, Romanian, Serbian

- Heartbeat / Auto-track from once per 1-30 days

- Excessive speed alert w/ selectable threshold

- Low car battery alert

- 2 selectable Geo-fences w/ alerts

- Selectable device icon

- Selectable control screen skin

- Panic from button in car or from app

- Check SIM balance (outside the USA only)

- Eaves drop feature allows you to listen to the vehicle's interior (outside USA only).

Optional LINKR-MIC required.

- Lock control

- Unlock control

- Trunk release

- Start / Stop Engine (optional remote start system required)

- 2 Auxiliary functions

- Dedicated starter disable function

- Assign up to 5 alert receivers

Quoi de neuf dans la dernière version 2.71.0

Last updated on May 21, 2019

Fixed issue with SMS command when app is force closed.

Chargement de la traduction...

Informations Application supplémentaires

Dernière version

Demande Omega Linkr mise à jour 2.71.0

Telechargé par

طارق أشرف

Nécessite Android

Android 4.3+

Voir plus
Langues
Abonnez-vous à APKPure
Soyez le premier à avoir accès à la sortie précoce, aux nouvelles et aux guides des meilleurs jeux et applications Android.
Non merci
S'inscrire
Abonné avec succès!
Vous êtes maintenant souscrit à APKPure.
Abonnez-vous à APKPure
Soyez le premier à avoir accès à la sortie précoce, aux nouvelles et aux guides des meilleurs jeux et applications Android.
Non merci
S'inscrire
Succès!
Vous êtes maintenant souscrit à notre newsletter.